ESA-Arcadia 01/31/25. Sam, Charlie & Jim O. Removed old PVI MAXIM and installed Bradford White, repipe cold supply to both water heaters, Removed old vent cleared up space. Good job Sam lead tech on this one.
77 Views

ESA-Arcadia 01/31/25. Sam, Charlie & Jim O. Removed old PVI MAXIM and installed Bradford White, repipe cold supply to both water heaters, Removed old vent cleared up space. Good job Sam lead tech on this one.
Xfyre wh7-0500A
Boiler kept faulting out on ignition lock out. Clogged up drain/condensation line.
ESA-Bakersfield removed old PVI Maxim atmospheric water heater and installed Bradford White 01/29/25 Charlie, Jim & Sam
Park West removed old custom tank and replaced with two 119 gallon storage tanks, thanks Brian, Sam, Andrew L. , Jose Marquez (Before & After)
Verified Employee
Verified Employee
Fresh 🤌