(LA Branch)
Pilgrim Tower North Pasadena
Before / after
Updated old water treatment system In Pasadena, shut off 2 repack boilers and recirculating pump then shut off booster pumps and main water line in basement then hooked up water hose to water treatment system to drain building from basement took about an hour an hour for 12 floors replace all water treatment parts except saddles then restore water, boilers, recirculating pumps, booster pumps, air out system and waited for a return line to get hot everything was up and running with no problems then service the WT system and made adjustment’s customer was happy with the service we performed. Dispenser will be polished
Nice job Robert and crew 👍