Windrose Apts

Work Done:
Reinstalled the water treatment system to the cold water line for Boiler #1. Installed a 2” Venturi using ProPress.
Crew:
Andres, Eli, Eric, Jack
24 Views


Work Done:
Reinstalled the water treatment system to the cold water line for Boiler #1. Installed a 2” Venturi using ProPress.
Crew:
Andres, Eli, Eric, Jack
Verified Employee
Verified Employee
@ebarnes121 @JackRuff